Waiting, somewhat Impatiently

The house, as I've been telling everyone for the past month, may be ready to move in in a couple weeks.
If all goes well, the sink/counter combinations might be installed this Saturday, February the 4th. Then just the faucets, shower stuff, and toilet placed.
The electricity, just need the well pump wired, the lighting fixtures, and finishing boxes installed.
Appliances arrive four days after countertops.
And final inspections!
I took a few pictures every week of changes, here is the photo bucket folder of them:
House Construction

Everyone working on the house has been fantastic, the foreman (Tim), and the Cabinet builder (Robert), and the shower tile man (I didn't catch his name), are just a few of the dozen or so brilliant people with brilliant abilities that did their own thing.

The outside shell and original ground work was done by the Monolithic Dome Institute.
Everything else on the inside was done by local people.
It will have taken about six months.
It will be our third house, the first one was an antique we bought near New Orleans, the second was the manufactured double wide that burned.
Will be nice to get out of this rental, since our time married, this will be the fourth rental we have lived in, two of those just since the fire. This isn't counting the hotels and family house we lived in between all of the above.
Will be so glad to finally have the forever home.